A first article is not a sample showpiece. It is the reference unit that confirms the drawing can be manufactured, the finish is correct, and the assembly sequence works. What you ask to be recorded at this stage determines how easily the batch can be accepted later.
1. Dimensions that matter
Not every dimension needs to be on a FAI report. Focus on functional ones: overall envelope, door openings, mounting hole positions, panel gaps, interface cutouts and anchor points. These are the dimensions that affect installation and fit with your components.
2. Fit and function
Open and close every door. Check that gaskets compress evenly, locks engage without force, and hinges hold the door in position. If the unit includes installed hardware, fit a representative component — display, reader, terminal — and confirm clearance.
3. Finish approval
Inspect under neutral light. Compare with the agreed sample, not only with a RAL chip. Record the coating batch, the colour reference and the gloss level. Photograph the cabinet from the same angles each time so later batches can be compared.
4. Material and gauge confirmation
Confirm that the delivered unit uses the specified gauge and material. This is the point to weigh representative panels and check certificates. Once production starts, a substitution is much harder to identify.
5. Documentation to request
- A dimension report against the approved drawing.
- The material and hardware list actually used.
- The finish record: coating batch, colour, film thickness.
- Photos of the unit from agreed angles.
- A list of any deviations and how they were resolved.
- The drawing revision number used to build the unit.
6. Sign-off and change control
One person should approve the first article in writing. The approved unit, the report and the drawing revision then form the baseline. Any later change — a component, a colour, a gauge — should be recorded against that baseline, not silently absorbed into the batch.
The first article is not a sample to admire. It is the reference the batch will be judged against.
7. How this protects the buyer
When a question arises at receiving, the FAI record answers it quickly: was it built to the approved revision, was the finish from the approved batch, was the deviation accepted. Without that record, the discussion starts from scratch.
Tell us which inspection records you need and we will include them in the first article package.