Custom cabinets & enclosures · drawing to export WhatsApp +86 157 5175 1930 · Send an inquiry

Notes from the workshop

What we make.
What we learn.

Practical notes on cabinet engineering, materials, finishing and export. Company updates and milestones will be added as the team grows.

Latest from the workshop

Technical notes and practical lessons from the workshop.

Explore how cabinets are engineered, finished, inspected and packed — along with occasional updates on the projects and milestones behind the work.

Outdoor battery energy storage cabinet enclosure
Energy storage · IP protection

Is IP55 enough for an outdoor BESS enclosure?

What the rating covers, where it stops, and the thermal and site decisions that complete the specification.

Material and finish options for a custom electrical enclosure
Electrical enclosures · Specification

How to specify a custom electrical enclosure

The buyer information that changes construction, protection, finish, inspection and quotation.

Sealed outdoor electrical cabinet with rain hood, cable glands and protective door gasket
Standards & specification

NEMA or IP? Specify protection without mixing the systems

Where the two systems overlap, why they are not interchangeable, and what to put on the drawing.

Smart cabinets at four integration stages
Supply scope

Enclosure, hardware, software or platform: choose your scope

Four levels of supply. Join at any one and hand over as much or as little as you want.

Sheet metal and finish options for a cabinet
Materials & finish

Material, finish or IP rating: what actually decides durability

Three decisions before a cabinet is built, and why the drawing name alone is not enough.

Outdoor cabinet ingress protection
Ingress protection

IP54, IP65, IP66: what outdoor cabinets actually need

Reading the IP code against the site, and where regional expectations differ.

Colour sample panel next to a RAL chip
Finishing · Quality

Why a RAL chip is not enough to approve a colour

Agree the sample panel, gloss, film thickness and inspection light before the batch.

First article cabinet measured before production
Quality

First article inspection: what to ask for before production

The record the whole batch is measured against, and what it should contain.

Cabinet production stages on the factory floor
Lead time

How long does a custom cabinet actually take?

Seven stages, where the weeks go, and what you can do to shorten them.

Reference photo used to start a cabinet quotation
Engineering support

No drawing? What we need to quote from a photo

A photo can start a quote. Then we need a short list of decisions.

Branding and tooling ownership in cabinet projects
Commercial terms

OEM or ODM: who owns the tool, the brand and the design?

How tooling, design and brand ownership differ, and what to settle before quoting.

Cabinet shipment unpacked and checked on arrival
Logistics

What to check when a container of cabinets arrives

An ordered receiving check, from the container seal to doors and earthing.

Cabinet export packed on a wooden pallet
Packing

Flat-pack or fully assembled? How a cabinet should leave the factory

Shipping state, outer package and moisture protection, and what each changes.

Complete self-service terminal hardware
Project scope

Enclosure, barebone or complete terminal?

Where the cabinet stops, where the integration begins, and what each scope means for design control.

Outdoor energy storage cabinet enclosure
Enclosure engineering

What to define for an outdoor energy-storage cabinet

A practical pre-quote checklist covering ingress, doors, base, lifting, finish, and interfaces.

Powder coating line at the ENERAREA factory
Surface finishing

Powder coating or wet paint for export cabinets?

Start with the service environment, substrate, appearance requirement, and touch-up plan.

Editorial scope

Manufacturing information, not filler news.

We will add project guidance, material and process comparisons, factory updates, and relevant industry developments here. Each article should answer a real buyer question and remain useful after a campaign ends.

Ask a question for a future technical note →