Notes from the workshop
What we make.
What we learn.
Practical notes on cabinet engineering, materials, finishing and export. Company updates and milestones will be added as the team grows.
Latest from the workshop
Technical notes and practical lessons from the workshop.
Explore how cabinets are engineered, finished, inspected and packed — along with occasional updates on the projects and milestones behind the work.

Is IP55 enough for an outdoor BESS enclosure?
What the rating covers, where it stops, and the thermal and site decisions that complete the specification.

How to specify a custom electrical enclosure
The buyer information that changes construction, protection, finish, inspection and quotation.

NEMA or IP? Specify protection without mixing the systems
Where the two systems overlap, why they are not interchangeable, and what to put on the drawing.

Enclosure, hardware, software or platform: choose your scope
Four levels of supply. Join at any one and hand over as much or as little as you want.

Material, finish or IP rating: what actually decides durability
Three decisions before a cabinet is built, and why the drawing name alone is not enough.

IP54, IP65, IP66: what outdoor cabinets actually need
Reading the IP code against the site, and where regional expectations differ.

Why a RAL chip is not enough to approve a colour
Agree the sample panel, gloss, film thickness and inspection light before the batch.

First article inspection: what to ask for before production
The record the whole batch is measured against, and what it should contain.

How long does a custom cabinet actually take?
Seven stages, where the weeks go, and what you can do to shorten them.

No drawing? What we need to quote from a photo
A photo can start a quote. Then we need a short list of decisions.

OEM or ODM: who owns the tool, the brand and the design?
How tooling, design and brand ownership differ, and what to settle before quoting.

What to check when a container of cabinets arrives
An ordered receiving check, from the container seal to doors and earthing.

Flat-pack or fully assembled? How a cabinet should leave the factory
Shipping state, outer package and moisture protection, and what each changes.

Enclosure, barebone or complete terminal?
Where the cabinet stops, where the integration begins, and what each scope means for design control.

What to define for an outdoor energy-storage cabinet
A practical pre-quote checklist covering ingress, doors, base, lifting, finish, and interfaces.

Powder coating or wet paint for export cabinets?
Start with the service environment, substrate, appearance requirement, and touch-up plan.
Editorial scope
Manufacturing information, not filler news.
We will add project guidance, material and process comparisons, factory updates, and relevant industry developments here. Each article should answer a real buyer question and remain useful after a campaign ends.